Translations:Anwendungsbeispiel: Umsetzung eines Betriebsplans/64/en
| Parameters | Defaults | Affected Parameters: |
|---|---|---|
| Time | January 30 | flood protection, water supply. (Factor1, Factor2) |
| Initial storage volume | 23M m³ | all discharge functions |
| Average daily inflow | 0.180 m³/s | standard discharge |
| Average water demand | 0.300 m³/s | discharge for water supply |
| Discharge for water supply since 1.Jan. | 0.750M m³ | discharge for water supply |