Translations:Betriebsplan/7/en

Aus TALSIM Docs
subject Questions about real-world operating rule Questions about Talsim-NG river basin model Implementation in Talsim-NG
measured values IOn which measured values are the operating rules based? Which parameters are measured? Which is the equivalent simulated value, or from which simulated value could the parameter be derived? All simulated values i.e. input-, output- and state variables of the system elements are generally accessible (e.g. discharge, reservoir content, ...). choose system element and parameter
→ implement system state
spacial reference At which location ist the measurement made? Which specific system element (key) can therefor represent the measurement (with which simulated value for system state)?
temporal reference What is the temporal reference of the measurement? Is the instantaneous value used, a balance or an antecedent value? Which of the available options in Talsim-NG represents the temporal reference best? Define objective of the system state and options for value changes respectively
transformation Is the measured value changed subsequently bevor it is includet in the operating rule (e.g.unit conversion, weighting function, ...) ? Which function in Talsim-NG can represent the transformation? Selection and Implementation of the transformation function of the system state