Translations:Betriebsregeltypen/91/en: Unterschied zwischen den Versionen
Ferrao (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „:If a division into more than two sequences is necessary, the threshold value concept can be applied several times in succession. The sequence determines the p…“) |
Keine Bearbeitungszusammenfassung |
||
Zeile 1: | Zeile 1: | ||
:If a division into more than two | :If a division into more than two discharges is necessary, the threshold concept can be successively applied several times. The order of the discharges determines the priorities of the water distribution. |
Aktuelle Version vom 31. März 2021, 13:27 Uhr
- If a division into more than two discharges is necessary, the threshold concept can be successively applied several times. The order of the discharges determines the priorities of the water distribution.