Translations:Betriebsplan/12/en
Version vom 16. März 2021, 13:25 Uhr von T.Schnellbach (Diskussion | Beiträge)
| A | Current Value | Uses the current value without any modifications |
| F | Function | Value is transformed by applying a function |
| B | Balance (with target) | Value is used as a discrepancy from the target value in % |
| C | Balance (without target) | Calculates the balance of the value over several timesteps |
| Z | Objective function | Value is the result of an objective function |
| P | Control gauge | Currently disabled |
| S | Sum | Sum of the state instead of a single value |