Abgabenfenster/en: Unterschied zwischen den Versionen
Ferrao (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
Ferrao (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „Time Dependent Function“) |
||
Zeile 87: | Zeile 87: | ||
Time Dependent Function | |||
[[Datei:Fenster_Funktion_Zeitabhängig.PNG|Datei:Fenster_Funktion_Zeitabhängig.PNG]] | [[Datei:Fenster_Funktion_Zeitabhängig.PNG|Datei:Fenster_Funktion_Zeitabhängig.PNG]] |
Version vom 12. Januar 2021, 17:03 Uhr
An already created release can be edited by double-clicking the box with the release identifier in the release area or by right-clicking the box -> edit. For this purpose, a new window opens with the two sections Define release and Calculation method:
Define release
In the upper section Define release the name and the identifier for type/use of the release can still be changed.
There are also three buttons on the right:
Rules + Controls
Clicking the Rules + Controls button opens a window that can be used to link a system state or state group to the release.
To do this, the desired system state/state group is selected from the list, marked with a mouse click and assigned to the release with the Assign button File:Button_assign.PNG. This scales the release with the system state/state group. The Remove button File:Remove_button.PNG removes the link.
In the release window, an icon next to the "Rules + Controls" button indicates whether there is a connection to a system state/state group or not .
Value change
By clicking the button Value change a window opens in which can be set when a change of the values of the releases is allowed. Three options are available for this purpose:
Description
Clicking the button Description opens a window in which a descriptive text for the delivery can be inserted, which can facilitate the comprehensibility of the model at a later time or for other users.
Method of calculation
Releases per time step/ Order of releases
Function ( + Hydrograph/ Time series)
The following function types can be selected from the drop-down list:
KNL |
Capacity Curve |
LAM |
Pool-Based Operating Plan |
XYZ |
Time Dependent Function |
Capacity Curve
Pool-Based Operating Plan
Time Dependent Function
Wehrüberfall
Druckrohrleitung