Translations:Belastungsdefinition/ Modellinput/11/en

Aus TALSIM Docs
Version vom 22. Dezember 2020, 17:03 Uhr von T.Schnellbach (Diskussion | Beiträge)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)

It is important that the time series are gap-free for the simulation period. Possible gaps in the time series must be closed before use (e.g. by regressions to similar time series or by other assumptions). Ideally, but not necessarily, the time series are equidistant in at least the resolution of the simulation time step. Apart from the time series value, the interpretation of the time series is also crucial for the simulation. Furthermore, it is important to ensure that time series values are given in the appropriate unit (e.g. m³/s for the discharge or mg/l for the concentration). Some system elements offer the option to scale time series with an additional factor.