Translations:Berechnungsschema/ Implementierung der Betriebsregeln/16/en

Aus TALSIM Docs
Version vom 21. Januar 2021, 18:26 Uhr von Ferrao (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „If the section is exceeded for at least one delivery function, the changes that have occurred up to that point in both the memory contents and the deliveries m…“)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)

If the section is exceeded for at least one delivery function, the changes that have occurred up to that point in both the memory contents and the deliveries must be registered and C1 and C2 recalculated. With this method, the used time interval - the outer time step - is processed by an arbitrary number of inner time steps depending on the density of the interpolation points. The time until a range change can be determined by transforming to t from the following equation: