For every (temporal) supporting point in the annual pattern values for x and y are declared. Is the system state bevor the transformation smaller than the x value, it is set to zero. Is it equal or bigger than the x value, it is transformed to the y value. The current date / timestamp decides which supporting point is used for the transformation.
For each (temporal) supporting point values for x and y are entered. If the system state value before the transformation is smaller than the x-value, it is set to zero. If it is equal or bigger than the x-value, it is transformed to the y-value. Every current date / timestamp decides which respective supporting point is used for the transformation.

Version vom 16. März 2021, 16:25 Uhr

Information zur Nachricht (bearbeiten)
Zu dieser Nachricht ist keine Dokumentation vorhanden. Sofern du weißt, wo und in welchem Zusammenhang sie genutzt wird, kannst du anderen Übersetzern bei ihrer Arbeit helfen, indem du eine Dokumentation hinzufügst.
Nachricht im Original (Betriebsplan)
Pro zeitlicher Stützstelle wird jeweils ein x- und ein y-Wert eingegeben. Ist der Systemzustandswert vor der Transformation kleiner als der x-Wert wird er zu Null. Ist er größer/gleich dem x-Wert wird er zum y-Wert transformiert. Das aktuelle Datum entscheidet dabei jeweils welche zeitliche Stützstelle verwendet wird.

For each (temporal) supporting point values for x and y are entered. If the system state value before the transformation is smaller than the x-value, it is set to zero. If it is equal or bigger than the x-value, it is transformed to the y-value. Every current date / timestamp decides which respective supporting point is used for the transformation.