Translations:Betriebsregeltypen/73/en: Unterschied zwischen den Versionen
Ferrao (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „:On the other hand there are priorities which are based on physical values. An example in this sense is the turning off of a turbine in times of water shortage…“) |
Keine Bearbeitungszusammenfassung |
||
Zeile 1: | Zeile 1: | ||
: | :However, there are some priorities based on physical conditions. An example is turning off a turbine in times of water shortage in favor of securing the water supply. In practice, operating rules often meet this problem by fulfilling demands up to defined reservoir volumes, but not maintaining discharges below the set reservoir volume. |
Version vom 31. März 2021, 12:34 Uhr
- However, there are some priorities based on physical conditions. An example is turning off a turbine in times of water shortage in favor of securing the water supply. In practice, operating rules often meet this problem by fulfilling demands up to defined reservoir volumes, but not maintaining discharges below the set reservoir volume.