Translations:Betriebsregeltypen/91/en: Unterschied zwischen den Versionen
Ferrao (Diskussion | Beiträge) (Die Seite wurde neu angelegt: „:If a division into more than two sequences is necessary, the threshold value concept can be applied several times in succession. The sequence determines the p…“) |
(kein Unterschied)
|
Version vom 26. November 2020, 18:09 Uhr
- If a division into more than two sequences is necessary, the threshold value concept can be applied several times in succession. The sequence determines the priorities of the water allocation.