Translations:Ganglinienfenster/10/en

Aus TALSIM Docs
  1. 'Independent creation of a hydrograph
    Double-click on the first line to edit the date and value. Double-click afterwards on the second line variable times with appropriate values can be entered in the mode edit values. With OK both entries are taken over and jump directly to the next line. The time specification can be refined as desired. With Cancel all entries are stored and the editing mode edit values is terminated.
    Datei:Ganglinie006.png
    With Edit another line can be added and removed with Delete. The mean value is calculated automatically from the entered values. With interpolation activated, the values are interpolated between two dates. If the field interpolation is not active, the value for a date is assumed constant until the next date.
    Thus, the following annual cycle results:
    Datei:Ganglinie007.png
  2. Take over of an already existing hydrograph
    If yearly, weekly, daily hydrographs already exist in other variants, which can be taken over, click on the symbol Datei:Ganglinie014.png. An overview with all projects and variants opens. Now click on the corresponding variant and select the hydrograph you are looking for. With Apply the data are transferred into their new time series.

Datei:Ganglinie008.png Datei:Ganglinie009.png