Translations:Anwendungsbeispiel: Umsetzung eines Betriebsplans/19/en

Aus TALSIM Docs

If the normal water level of the dam is exceeded and the inflow exceeds the maximum discharge of 5 m³/s, no more than 5 m³/s may be discharged from the bottom outlet. Additional inflow is to be discharged via the spillway.