Translations:Betriebsplan/7/en

Aus TALSIM Docs
Subject Questions about real-world operating rule Questions about Talsim-NG river basin model Implementation in Talsim-NG
Measured variable Which measured variables are the operating rules based on? Which variables are measured? Which is the equivalent simulated variable, or from which simulated variable could the parameter be derived? All simulated variables i.e. input-, output- and state variables of the system elements are generally accessible (e.g. discharge, reservoir content, ...). choose system element and parameter
→ implement system state
Spatial reference At which location ist the observation / measurement made? Which specific system element (key) can therefor represent the observation / measurement (with which simulated value for system state)?
Temporal reference What is the temporal reference of the observation / measurement? Is the instantaneous value used, a balance or an antecedent value? Which of the available options in Talsim-NG represents the temporal reference best? Define objective of the system state and options for value changes respectively
Transformation Is the measured value changed subsequently bevor it is included in the operating rule (e.g. unit conversion, weighting function, ...)? Which function in Talsim-NG can represent the transformation? Selection and Implementation of the transformation function of the system state